Previous incidents
CA-MTL-3 Network Issue
Resolved May 14, 2026 at 9:49pm UTC
Network issue is resolved and operating normally.
2 previous updates
Console: Delayed Pod starts and Empty Console Logs
Resolved May 8, 2026 at 9:49pm UTC
The issue has been resolved. Functionality for pod starts and display for logs on the console have returned to normal.
2 previous updates
CA-MTL-1 and CA-MTL-3 Network Issue
Resolved Apr 28, 2026 at 8:12am UTC
Network connectivity to CA-MTL-1 DC has been restored.
2 previous updates
Runpod.io website is unavailable
Resolved Apr 14, 2026 at 8:41pm UTC
Issue with runpod.io website has been resolved. We are continuing to monitor for issues.
1 previous update
Incident Notice: Power Service Interruption – US-NC-1
Resolved Apr 4, 2026 at 5:58pm UTC
Update:
At 1:45 PM PT, Power was restored to the site and machines had been started to be powered back on. The datacenter is back on full utility power with UPS backup. Datacenter engineers are continuing to look into why the generator supplied power at a voltage outside of expected range for the UPS which caused the UPS to not switch over.
Original issue:
Our datacenter US-NC-1 has reported a power failure at the US-NC-1 facility that occurred at approximately 8:00 AM PT ...